The CUPA requires SFSU to have a written SPCC program that defines how we conduct weekly, monthly, and annual internal inspections of  oil tanks (containing 55 gallons or more). The written plan must be reviewed, updated, and certified by a Professional Engineer (P.E.) every 5 years.
The CUPA inspects periodically to confirm SFSU's adhering to our written procedures, and every inspects five years, to confirm the  accuracy and completeness, of the written plan.

 

CY 2023 Update

The 5 year written plan review was completed and signed by a professional engineer.

There was no CUPA inspection for the SPCC in CY 2023. The 5 year inspection is due in 2024.